Allendale Ave to 100'+ east of Brewster Creek
Starts: January 2022
Ends: October 2022
Project Description
This project consists of replacing the two existing elliptical pipes under Waterloo Road with a Conspan type concrete culvert/tunnel. The two pipes on the private property to the south will be removed as part of the project. Project will include replacement of concrete curb, concrete sidewalk, utility relocation/repairs (water main, sanitary sewer, storm sewer, gas main and electric/communications}, asphalt pavement, concrete pavement, drive aprons and creek realignment.
Anticipated Maintenance of Traffic
Waterloo Road is anticipated to be closed during construction of the tunnel for about 3 months. Traffic will be routed to Wilbeth Road to the north.
Dollar Value of Project
$1,302,900
Benefits to Akron Upon Completion of Work
Reduction in area flooding during 10 year storm events.