Projects

Sanitary Sewer Reconstruction 2018 Small Diameter Lining

Locations throughout the city

Starts: April 2020
Ends: December 2020

Project Description

The purpose of this project is to repair or replace degraded areas of the sanitary sewer system. The work will be completed by CIPP lining of existing sewer infrastructure; no excavation is planned. Locations of the 62 necessary repairs were determined from the City’s CMOM Program and filtered for criticality and potential for failure.

Anticipated Maintenance of Traffic

Closures of 1 week or less may be needed in some locations. Residents will be notified of the work and any partial road closures or detours.

Dollar Value of Project

$1,627,500

Benefits to Akron Upon Completion of Work

Service life of repaired sewers will increase by a minimum of 50 years, and inflow and infiltration of groundwater and stormwater into the sewer system will be reduced.

Associated Traffic Alerts

Brown Street (1)